Ghana Energy & Infrastructure News

Follow Ghana's energy and infrastructure story: electricity supply and the power grid, ECG and dumsor, fuel prices, oil and gas, and the road, rail, and port projects reshaping the country. Curated from Ghana's leading newsrooms and updated through the day, newest first.

Big Push: Kofi Job completes first phase of Tepa-Marban-Goaso Road 15 monthsahead of schedule
energy and infrastructure|

Kofi Job Construction completes 22km Tepa-Goaso road phase 15 months early

Kofi Job Construction Limited has achieved a significant milestone by completing the first phase of the Tepa-Maban-Goaso road project 15 months ahead of its scheduled 24-month timeline. The 22-kilometre section, which runs from Maban toward the River Goa bridge, reached 93% completion just nine months after work began. This rapid progress marks a major step forward for the 39-kilometre total project, which is designed to improve connectivity between the Ashanti and Ahafo regions. Project Director Kwabena Owusu Aduomi highlighted that the construction team overcame substantial environmental challenges to reach this stage. Specifically, the route includes several swampy areas that required specialized engineering to ensure long-term durability. To address this, the company implemented robust drainage systems alongside high-quality asphalt layering. Aduomi assured the public and government officials that these measures would protect the integrity of the road surface against heavy rainfall and soil saturation. With the structural work on the first phase finished, the remaining tasks involve the installation of essential road safety features, such as signage and protective barriers. Meanwhile, the Ministry of Roads and Highways has initiated the process of seeking financial certification to trigger the commencement of the second phase of the project. This subsequent stage will extend the improvements from the River Goa bridge to Goaso, fulfilling the complete 39-kilometre scope of the infrastructure upgrade.

energy and infrastructure|

Governs Kwame Agbodza pledges prompt payment for Big Push road projects

Minister of Roads and Highways Governs Kwame Agbodza has assured contractors working on the ‘Big Push’ Road Infrastructure programme that the government will ensure prompt payment for all completed work. During an inspection tour of the Sunyani Outer Ring Road and the Sunyani-Atronie-Acherensua Road projects in the Bono Region, the Minister stated that the current administration has secured the necessary funding to prevent the payment delays that have historically hindered national infrastructure development. Mr. Agbodza confirmed that funding is readily available for contractors who fulfill their obligations and timeously submit their payment certificates. He noted that unlike in previous years, arrears are being addressed systematically to ensure that projects do not stall due to cash flow issues. The Minister encouraged contractors, including Alexiboam and Kofi Job Companies, to maintain their momentum, noting that those who work efficiently will see their financial claims settled without hesitation. While highlighting the availability of funds, the Minister issued a stern warning against compromising quality standards. He stressed that the expedited timelines of the Big Push initiative must not serve as an excuse for substandard work. Mr. Agbodza urged contractors to strictly adhere to technical specifications to ensure the longevity of the infrastructure and avoid the need for premature repairs, which would ultimately increase the financial burden on the state. The ‘Big Push’ programme, a flagship initiative of President John Mahama’s administration, aims to transform Ghana’s infrastructure landscape to drive economic growth and enhance connectivity. The Sunyani Outer Ring Road project, currently being executed by Kofi Job Company Limited, is expected to link several communities to major highways and is reportedly moving ahead of schedule. The Minister’s tour underscores the government’s focus on infrastructure as a cornerstone of national development, with these regional projects expected to be completed within a two-year timeframe.

Energy Commission submits EV charging regulations to Parliament
energy and infrastructure|

Energy Commission submits EV charging regulations to Parliament

The Energy Commission has moved to establish a comprehensive regulatory framework for Ghana's burgeoning electric vehicle (EV) sector, focusing on charging infrastructure and battery-swapping systems. These proposed regulations are currently undergoing the approval process within Parliament. The initiative responds to the increasing visibility of electric cars on Ghanaian roads and the urgent need for a standardized environment to govern their operation and maintenance. According to Ms. Joyce Caitlyn Ocansey, a Programme Coordinator at the Commission, the regulatory framework is essential for managing the technical and environmental aspects of the industry. Beyond setting standards for charging stations, the guidelines will address the effective disposal of used batteries, ensuring that the transition to green energy does not result in unintended environmental hazards. The Commission is working closely with the Ministry of Transport to align these standards with national transport policies and environmental regulations. A key objective of the new framework is to stimulate private sector participation and attract investment into the country's charging infrastructure. The Energy Commission is particularly emphasizing the development of solar-based charging solutions to ensure that the power used by EVs is truly sustainable. By providing a clear and predictable legal environment, the government aims to facilitate a smooth transition to electric mobility, reducing the nation's dependence on fossil fuels and promoting long-term energy security.

John Abdulai Jinapor outlines plan to install 3,000 transformers
energy and infrastructure|

John Abdulai Jinapor outlines plan to install 3,000 transformers

Minister for Energy and Green Transition Dr. John Abdulai Jinapor has announced a strategic plan to install 3,000 new transformers across Ghana in 2027. This initiative is a core component of the ministry's broader effort to enhance electricity reliability and meet the growing energy demands of the country. Speaking during a performance review of energy sector institutions for the year 2026, the Minister detailed how the government intends to build a more resilient and affordable energy infrastructure to support economic growth. Refinement of the power distribution network remains a top priority to ensure that the gains made in generation capacity translate into stable power for consumers.Reflecting on the progress made over the past year, Dr. Jinapor highlighted that Ghana's national electricity access reached 89.13% by the end of 2026. While acknowledging this milestone, the Minister noted that increasing access must be matched by improvements in the quality of service. The planned rollout of 3,000 transformers is specifically designed to address local grid instabilities and ensure that communities already connected to the national grid experience fewer power fluctuations and improved voltage quality. This technical expansion is expected to reduce technical losses and improve the overall efficiency of the distribution system.The Minister also used the review session to demand greater accountability from the various energy agencies and institutions under his purview. He emphasized that for the 2027 targets to be met, there must be a significant shift toward efficiency and transparency in operations. Dr. Jinapor urged the leadership of these agencies to demonstrate tangible performance improvements, stressing that the public expects value for money and a dependable energy supply. He cautioned that administrative hurdles and inefficiencies must be eliminated to streamline the delivery of energy projects and maintain public trust.Looking ahead, the Ministry for Energy and Green Transition remains focused on creating a secure energy environment that can sustain industrial expansion and improve the daily lives of Ghanaians. The 2027 priorities represent a pivot toward modernizing the grid and ensuring long-term energy security. By prioritizing both infrastructure expansion and institutional reform, the government aims to position the energy sector as a robust engine for national development in the coming year, providing the necessary foundation for a more prosperous economy.

A group of four men are pictured at an official award ceremony where Mr. Edmond Kombat, the Managing Director of Tema Oil Refinery (TOR), is being presented with a framed citation. The citation honors him as the Energy Sector Recovery Programme (ESRP) Champion of the Year for 2026, signed by the Minister for Energy and Green Transition.
energy and infrastructure|

Edmond Kombat named Energy Sector Reform Programme Champion of the Year

Edmond Kombat, the Managing Director of the Tema Oil Refinery (TOR), has been honored as the Energy Sector Reform Programme (ESRP) Champion of the Year 2026 for the petroleum sector. The award was presented by the Minister for Energy and Green Transition, Dr. John Abdulai Jinapor, during the Ministry’s Annual Performance Review Retreat. This recognition highlights Kombat’s leadership in driving reforms aimed at enhancing the financial sustainability and operational performance of Ghana’s energy landscape. The award specifically acknowledges the successful revitalization of TOR under Kombat's management. Key achievements cited by the Ministry include the completion of critical turnaround maintenance and the subsequent resumption of crude oil refining at the facility. These efforts have led to measurable improvements in operational efficiency, cost reduction, and revenue generation. The reforms implemented at the refinery are seen as central to the government's broader strategy to stabilize the energy sector and ensure long-term industrial viability. Upon receiving the award, Kombat expressed his appreciation to President John Mahama for his leadership and vision in overseeing the ongoing energy sector recovery. He also extended gratitude to the Ministry of Energy and Green Transition and the dedicated staff at TOR, attributing the success to collective effort. Kombat noted that while the award is a celebration of recent milestones, it also serves as a mandate to maintain high standards of governance and operational excellence to support Ghana's economic transformation and energy security goals.

Alhaji Farouk Aliu Mahama donates 100kVA transformer to Nayilifong
energy and infrastructure|

Alhaji Farouk Aliu Mahama donates 100kVA transformer to Nayilifong

Alhaji Farouk Aliu Mahama has donated a 100kVA electricity transformer to the people of Nayilifong, a community that has grappled with inconsistent power supply for several months. The equipment, which arrived in the community on October 6, is intended to stabilize the local grid and provide a permanent solution to the erratic electricity that has hampered both domestic life and economic activities in the area. The intervention comes at a crucial time as the community had been experiencing frequent outages that disrupted the daily routines of residents and the operations of small-scale businesses. The arrival of the transformer was met with spontaneous celebrations from residents, who had long advocated for an upgrade to their power infrastructure. Community leaders noted that the lack of a reliable power source had become a major bottleneck, leading to frequent blackouts that affected safety and productivity. The donation is viewed as a critical intervention that directly addresses these challenges, restoring hope to a population that felt overlooked during the period of energy instability. Many residents expressed profound gratitude, noting that the new unit will alleviate the burden of living with unpredictable power. This philanthropic gesture is particularly noteworthy as it follows Alhaji Farouk Aliu Mahama’s loss in the 2024 general elections. Residents and local observers praised him for maintaining his commitment to the constituency’s welfare regardless of his political status, emphasizing that his actions demonstrate a genuine interest in the development of the community. Many local entrepreneurs expressed relief, stating that the new 100kVA unit will allow them to resume full operations without the fear of power surges or prolonged outages damaging their equipment. With the transformer now on-site, technical teams are expected to begin the installation and integration process into the existing network immediately. Beyond the immediate restoration of stable light, the new equipment is anticipated to boost the local economy by supporting workshops, shops, and other small-scale industries that rely on a steady electricity supply. The community continues to celebrate the intervention, which they believe marks a significant step forward in improving the local infrastructure and overall quality of life for the people of Nayilifong.

A prominent Chevron corporate logo sign is positioned in the foreground of a highway scene. Several large white semi-trucks and a van are visible on the road behind it, with a green exit sign for Lomas Santa Fe Drive and a coastal hill in the background.
energy and infrastructure|

Shell and Chevron sign MoU to explore Ghana's Eastern Keta Basin

Shell and Chevron have signed a Memorandum of Understanding (MoU) with the government of Ghana to explore oil and gas opportunities in the Eastern Keta Basin. The announcement was made by Simon Madjie, the Chief Executive Officer of the Ghana Investment Promotion Authority (GIPA), during an interview on Joy News’ PM Express Business Edition. This strategic move marks a significant expansion of international interest in Ghana’s upstream petroleum sector as the country seeks to unlock new offshore resources. In addition to the exploration agreement with Shell and Chevron, the petroleum sector is seeing substantial capital commitments from existing major players. Mr. Madjie revealed that the Jubilee partners have committed $2 billion toward a drilling program involving 20 new wells, while ENI and its partners have pledged an additional $1.5 billion. These investments, totaling $3.5 billion, represent a major boost for the national economy and indicate sustained confidence in the industry’s growth potential under President John Mahama’s administration. The GIPA CEO also highlighted growing interest from other global energy entities, noting that Brazil’s Petrobras has expressed interest in Ghana’s available oil blocks. Furthermore, discussions are currently underway regarding a potential return of ExxonMobil to the Ghanaian market. While Madjie confirmed that talks with ExxonMobil are happening, he declined to provide specific details or timelines, suggesting that further technical inquiries should be directed to the Ministry of Energy and the Petroleum Commission. This wave of investment and exploration activity reflects a renewed effort to optimize Ghana’s oil and gas production. The Eastern Keta Basin is particularly targeted as a frontier region with high resource potential. As Shell and Chevron begin their preliminary work under the new MoU, the government remains focused on creating a stable investment climate to ensure these high-value projects translate into long-term energy security and economic development for the nation.

Nana Dokua Amponsah lll, Paramount Queenmother of the Osudoku Traditional Area
energy and infrastructure|

Nana Dokua Amponsah III calls for balanced development in Shai-Osudoku

Nana Dokua Amponsah III, the Paramount Queenmother of the Osudoku Traditional Area, has called on the government to address the developmental imbalance within the Shai-Osudoku District. Speaking on the current state of infrastructure, the Queenmother emphasized that while the district as a whole has seen some growth, the benefits have been unevenly distributed, predominantly favoring Dodowa. She urged the authorities to ensure that Osudoku receives its fair share of national resources to foster holistic growth across the region. Central to her appeal is the urgent need for improved road networks, particularly in agricultural hubs such as Asutsuare and Tsopoli. Nana Dokua Amponsah III pointed out that the current state of the roads serves as a major bottleneck to the area's economic potential. As a vital food basket for the Greater Accra Region, Osudoku's agricultural output is significant, yet the difficulty in transporting goods to market remains a persistent challenge for local farmers and traders. The Queenmother further noted that enhanced infrastructure is essential to attracting private sector investment to the area. She argued that better roads would not only facilitate the movement of agricultural produce but also encourage businesses to set up operations in Osudoku, thereby creating jobs for the youth. By focusing development efforts solely on the district capital, Dodowa, she warned that other productive areas are being left behind, hindering the overall economic progress of the district. In her concluding remarks, Nana Dokua Amponsah III called for immediate government intervention to rehabilitate deteriorating roads and provide other essential amenities. She stressed that balanced development is not just a matter of fairness but a strategic necessity to maximize the district's contribution to the national economy. The Queenmother's plea serves as a reminder to policymakers that rural and agricultural communities require targeted infrastructure support to thrive and sustain their roles in the national food supply chain.

Some volunteers and staff of the Ashaiman Municipal Assembly desilting the drain during the last National Sanitation Day exercise
energy and infrastructure|

Ashaiman Municipal Assembly lobbies for completion of Gbemi storm drain

The Ashaiman Municipal Assembly (ASHMA) has issued an urgent appeal for financial support to complete a critical engineered storm-drain system at the Gbemi Stream. Despite construction commencing in 2020, the project has seen minimal progress, with only 150 meters of the proposed drainage infrastructure currently finished. The Municipal Chief Executive (MCE), Freeman Tsekpo, emphasized that the delay leaves the community increasingly vulnerable to the threat of persistent flooding during the rainy season. According to the Assembly, the current infrastructure gap poses a significant risk to residents and businesses within the municipality. While ASHMA has relied on periodic dredging of the stream to manage water levels and mitigate immediate flood risks, Mr. Tsekpo noted that these temporary measures are not a viable substitute for a fully realized, modernized drainage system. The incomplete project at Gbemi Stream remains a focal point for the Assembly’s efforts to improve urban resilience against extreme weather events and to safeguard local property. The flooding challenge is further complicated by human activity, specifically the indiscriminate dumping of refuse into the watercourse. This waste accumulation significantly impedes the natural flow of water, rendering existing drainage efforts less effective and increasing the likelihood of overflows. In response, the Assembly is introducing stricter monitoring and waste management strategies to curb illegal disposal. These initiatives aim to protect the integrity of the stream and ensure that any progress made on the infrastructure is not undermined by environmental degradation. The push for the completion of the Gbemi storm drain aligns with broader national efforts to meet Sustainable Development Goals related to sustainable urban development and climate adaptation. As development pressures within Ashaiman continue to mount, the Assembly maintains that securing the necessary funding to finish the project is essential for the long-term safety and economic stability of the municipality. Officials continue to advocate for the resources needed to transform the Gbemi Stream from a seasonal threat into a managed asset.

Nigeria Finance Minister unveils petrol discount for transport operators
energy and infrastructure|

Nigeria Finance Minister unveils petrol discount for transport operators

Nigeria’s Finance Minister has announced a new set of measures aimed at providing financial relief to the public transport sector through a petrol discount scheme. These initiatives are specifically designed to mitigate the impact of energy shocks on the population as the nation prepares for its upcoming elections. The government’s intervention focuses on reducing the financial burden on transport operators, which is expected to have a stabilizing effect on the cost of travel for millions of citizens across the country. The policy comes at a critical time when the cost of fuel has direct implications for the cost of living and the mobility of the Nigerian people. By targeting public transport operators with direct discounts, the government aims to prevent the inflationary ripple effects that high energy costs typically have on the broader economy. The Finance Minister emphasized that these measures are essential relief efforts intended to shield the public from the volatility often associated with the global and domestic energy markets. Despite being Africa’s largest oil producer, Nigeria continues to face significant challenges regarding fuel price stability and energy security. The introduction of these measures highlights the ongoing efforts to manage the country's energy landscape, which now includes the Aliko Dangote refinery, the largest refinery on the continent. While the refinery represents a long-term infrastructure solution for the region, the newly announced discounts provide an immediate government response to ensure social and economic stability during the sensitive pre-election period.

Energy Commission develops regulations for electric vehicle charging
energy and infrastructure|

Energy Commission develops regulations for electric vehicle charging

Ghana’s Energy Commission is finalizing a new regulatory framework to manage the country’s burgeoning electric vehicle (EV) sector. This initiative comes in response to the growing presence of electric cars on national roads and the urgent need for standardized infrastructure. The proposed regulations, which cover EV charging stations and battery-swapping systems, are currently undergoing the approval process in Parliament. Ms. Joyce Caitlyn Ocansey, a Programme Coordinator at the Energy Commission, highlighted that the framework is vital for establishing industry standards and ensuring safety. Developed in collaboration with the Ministry of Transport, the regulations aim to provide a clear roadmap for operators and investors. By creating a formal legal structure, the Commission intends to foster a reliable environment that attracts investment into charging infrastructure while ensuring public safety and technical compliance. Environmental protection is a central pillar of the new rules, with specific provisions for the safe disposal and management of used batteries. This focus is intended to prevent potential environmental degradation as the volume of EV batteries increases. Additionally, the Commission is encouraging the adoption of solar-based charging solutions to ensure that Ghana’s shift toward electric mobility remains sustainable and minimizes the load on the national power grid. The introduction of these regulations marks a significant step in Ghana’s transition to green transport. Once approved by Parliament, the framework will provide the necessary oversight to regulate the market effectively, protecting both consumers and the environment. This move aligns with broader government efforts to modernize the transport sector and reduce carbon emissions through the promotion of electric mobility.

Farouk Aliu Mahama donates 100kVA transformer to Nayilifong
energy and infrastructure|

Farouk Aliu Mahama donates 100kVA transformer to Nayilifong

Alhaji Farouk Aliu Mahama, the former Member of Parliament for Yendi, has donated a new 100kVA electricity transformer to the Nayilifong community to address persistent power challenges in the area. The equipment, which arrived on October 6, is expected to provide a permanent solution to the erratic electricity supply that has plagued residents for several months. This intervention comes as a significant relief to the neighbourhood, where frequent outages had disrupted both domestic life and commercial productivity. The donation has been received with widespread enthusiasm and celebration by the residents of Nayilifong. Community members expressed their gratitude to the former lawmaker, praising him for his dedication to their welfare despite his recent electoral loss in the 2024 parliamentary elections. This gesture is seen as a fulfillment of his ongoing commitment to the development of the constituency and a testament to his continued support for infrastructure improvements in the Yendi area regardless of his current political standing. With the installation of the 100kVA transformer, electricity access in Nayilifong is set to stabilize, providing a more reliable environment for local businesses to thrive. Small-scale enterprises, including artisans and traders who depend on consistent power, are expected to see a boost in their daily operations. Community leaders noted that this improvement in the local grid will not only enhance the quality of life for residents but also contribute to the overall economic growth of the district by ensuring that essential services are no longer interrupted by technical failures.