Ghana Energy & Infrastructure News

Follow Ghana's energy and infrastructure story: electricity supply and the power grid, ECG and dumsor, fuel prices, oil and gas, and the road, rail, and port projects reshaping the country. Curated from Ghana's leading newsrooms and updated through the day, newest first.

Two people are seen crossing a narrow, improvised dirt path over a small body of water in a lush, rural landscape. One person is riding a bicycle across the precarious-looking culvert, which is surrounded by tall green grass and trees under a cloudy sky. This scene highlights the infrastructure challenges faced by residents in the Nadowli-Kaleo district.
energy and infrastructure|

Takpo-Nyuori residents appeal for permanent bridge in Nadowli-Kaleo

Residents of Takpo-Nyuori in the Nadowli-Kaleo District of the Upper West Region are calling on the government and local authorities to construct a permanent bridge to replace a fragile makeshift crossing. The current structure, which serves as a vital link for the community, is frequently washed away by rising water levels during the rainy season. This recurrent destruction leaves residents isolated and forced to take long, difficult detours, which significantly hinders their ability to access essential services and markets. The lack of a reliable bridge has severely hampered local economic activities and daily life. Alijatu Salifu, a local trader, highlighted the dangers the current crossing poses, particularly during heavy downpours. She noted that her business suffers as she is often unable to transport goods to market when the makeshift path is submerged or destroyed, threatening her livelihood. Assembly Member Alexis Anzagra further explained that the community has repeatedly attempted to repair the crossing with limited resources, but these efforts are consistently undone by the weather, highlighting that a permanent engineering solution is beyond the community's financial capacity. In response to the growing concerns, the Member of Parliament for Nadowli-Kaleo, Anthony Mwinkaara Sumah, has expressed his willingness to support the construction of a permanent bridge. However, the MP emphasized that a formal technical assessment must first be conducted by the appropriate authorities to determine the project's feasibility and the required technical specifications. Until such an assessment is completed and construction begins, residents continue to navigate the precarious makeshift crossing, hoping for a lasting solution to their perennial transport challenges.

energy and infrastructure|

John Mahama orders road facelifts in regional capitals for 70th anniversary

President John Dramani Mahama has issued a directive for the selection and enhancement of principal roads across all regional capitals in preparation for Ghana's 70th Independence Anniversary. The directive, which aims to ensure regional centers are appropriately prepared for the milestone celebrations in March 2027, focuses on improving the aesthetic and functional quality of major urban thoroughfares. The move highlights the government's focus on infrastructure development as a cornerstone of the upcoming national festivities. Minister for Roads and Highways, Kwame Governs Agbodza, announced the presidential order during a working tour of the Ahafo Region. He confirmed that the improvement works will commence in Goaso, the Ahafo regional capital, marking the start of a phased nationwide rollout. While the specific list of roads earmarked for rehabilitation has yet to be fully disclosed, the Ministry is tasked with identifying key routes that will benefit from the facelift to improve traffic flow and urban appearance. This infrastructure drive is part of a broader strategy by the Mahama administration to modernize the country's transport network and ensure that the benefits of the 70th-anniversary celebrations are felt beyond the national capital. The planned works are expected to include resurfacing, street lighting, and other beautification efforts. By upgrading the road infrastructure in regional capitals, the government seeks to enhance the experience for residents and visitors during the commemorative period while leaving a lasting legacy of improved transport facilities. As the March 2027 anniversary approaches, the Ministry of Roads and Highways is expected to provide further details regarding specific project timelines and the full scope of work for each region. The initial phase in Goaso will serve as a blueprint for subsequent developments across other regional capitals, ensuring a standardized approach to the nationwide facelift. The administration has emphasized that these projects will be prioritized to ensure completion ahead of the historic independence milestone.

Kwabena Ampofo Appiah, Managing Director of the State Housing Company (SHC), addresses a press conference in Ghana. He is seated behind a desk crowded with microphones from various media outlets, positioned in front of an SHC-branded backdrop and the national flag.
energy and infrastructure|

State Housing Company links Big Push road projects to expanded housing

The State Housing Company Limited (SHC) has identified the government’s Big Push infrastructure programme as a critical catalyst for extending residential developments into emerging communities beyond the capital. Managing Director John Sheriff Bawah emphasized that the success of the nation’s housing agenda is inextricably linked to the quality of transport infrastructure. According to the SHC, the expansion of road networks is making new residential projects significantly more accessible and viable for both the developer and potential homeowners. A primary example of this synergy is the Surge Homes project in Amrahia, where 195 housing units are currently being developed. Bawah noted that the improved road connectivity facilitated by the Big Push has transformed areas like Amrahia from isolated pockets into attractive residential hubs. He argued that housing delivery cannot stand in isolation; rather, it requires a robust transport backbone to ensure that people living outside the central business districts of Accra can commute efficiently and reliably. Beyond the Greater Accra Region, the SHC is aggressively expanding its housing portfolio to other major urban centers across the country. The company currently has active projects in cities including Kumasi and Takoradi as part of a broader strategy to address the national housing deficit. By leveraging the infrastructure improvements provided under the Big Push, the SHC aims to create sustainable communities that offer high-quality living standards while reducing the pressure on Accra’s overstretched infrastructure.

A photograph showing severely burnt utility poles and damaged electrical infrastructure following a fire incident. The wooden poles and cross-arms are charred, with power lines sagging precariously against a dark, overcast sky.
energy and infrastructure|

ECG works to restore power in Ashanti Region after high-tension pole fire

The Electricity Company of Ghana (ECG) has deployed technical teams to address a significant power outage currently affecting several communities within the Ashanti Region. The disruption follows a fire incident that severely damaged a critical high-tension pole located at Sokoban Ampeyoo, cutting off the electricity supply to both residential and commercial consumers in the vicinity. The outage, which occurred on Saturday, October 10, 2026, has primarily impacted four major areas: Sokoban, Ampeyoo, Asaago, and Apaaso. Upon identifying the source of the failure, ECG engineers were immediately dispatched to the site to begin emergency repairs. The company noted that the fire damage to the high-voltage infrastructure required a thorough assessment before safe restoration efforts could proceed, as the integrity of the transmission line was compromised by the blaze. In a statement regarding the incident, the utility provider offered a formal apology to the affected customers for the inconvenience caused by the sudden blackout. While an official cause for the fire has not yet been established, the company emphasized that its personnel are working diligently to replace the damaged pole and stabilize the local grid. Residents in the affected communities have been urged to remain patient while the technical teams complete the necessary work to ensure a safe and steady return of power to the area.

energy and infrastructure|

John Dramani Mahama commends Roads Minister over Big Push project pace

President John Dramani Mahama has commended the Minister for Roads and Highways, Governs Kwame Agbodza, for his effective oversight in ensuring that contractors maintain a high pace of work on the Big Push infrastructure initiative. During an inspection of the Ntotroso Bridge in the Ahafo Region, the President expressed satisfaction with the progress of construction, noting that the Ministry's management is crucial to the successful delivery of the government's development agenda. Addressing the media and local stakeholders during the site visit, President Mahama shared an optimistic outlook for the completion of these nationwide projects. He stated his confidence that the majority of infrastructure contracts awarded by the end of 2025 would be successfully completed by the end of 2027. This timeline is intended to ensure that the Ghanaian public begins to see the tangible benefits of these major investments within the current administration's term, emphasizing a commitment to efficient project management over delayed timelines. The President also took the opportunity to highlight the positive impact of corporate partnerships in national development, specifically praising Newmont Africa for its collaboration with the government on infrastructure projects in its host communities. He urged other mining firms operating across the country to follow Newmont's example by engaging in similar partnerships. Such collaborations, he noted, are essential for mobilizing the resources required for sustainable community development and ensuring that host regions benefit directly from the industrial activity in their areas. In his closing remarks, President Mahama underscored the importance of public-private sector synergy in enhancing the reach of infrastructure projects. He maintained that the government remains focused on creating a development framework that leverages the strengths of both state institutions and private industry. The Ntotroso Bridge project is seen as a key component of this regional connectivity strategy, aimed at improving transportation and economic activity within the Ahafo Region.

energy and infrastructure|

John Abdulai Jinapor warns energy sector CEOs of consequences for failure

Dr. John Abdulai Jinapor, the Minister for Energy and Green Transition, has issued a stern warning to the chief executives and managing directors of public energy institutions, stating they will face personal consequences for failing to deliver results. Speaking at the 2026 Energy Sector Performance Review Retreat, the Minister underscored the government's commitment to accountability, making it clear that non-performance will no longer be tolerated within the sector. He insisted that the public expects tangible results from these institutions to justify their operations. The Minister's remarks follow the recent government dissolution of nine boards across various sectors, three of which were within the Ministry of Energy and Green Transition. Jinapor emphasized that these actions demonstrate a significant shift toward stricter oversight and that there will be "no protection for failure" for those leading these agencies. He informed the gathered agency heads that their tenure depends entirely on their ability to meet institutional targets and improve service delivery in a transparent manner. Beyond general performance, Jinapor called for greater transparency and strict adherence to legal standards, particularly regarding procurement processes. He urged agencies to be honest in reporting both their achievements and their challenges, ensuring that legal compliance is maintained to prevent administrative lapses. By prioritizing efficiency and legal integrity, the Minister aims to eliminate the bottlenecks that have historically hampered the sector's growth and financial stability. The ultimate objective of this push for accountability is the creation of a reliable, affordable, and sustainable energy sector to drive Ghana’s economic transformation under President John Mahama. Minister Jinapor reiterated that the performance of these public institutions is central to the nation's broader development goals. He concluded that his ministry will continue to monitor institutional outputs closely to ensure that the energy sector remains a robust pillar of the national economy.

Hon. John Jinapor, Ghana's Minister of Energy and Green Transition, is pictured speaking at a podium during an official event. He is gesturing with one hand while holding a microphone, surrounded by several media microphones, with a background banner detailing a Jubilee Crude Oil Berth ceremony.
energy and infrastructure|

John Abdulai Jinapor outlines 2027 renewable and nuclear energy strategy

The Minister for Energy and Green Transition, Dr. John Abdulai Jinapor, has unveiled a comprehensive strategic roadmap aimed at transitioning Ghana toward cleaner and more resilient energy sources by 2027. The plan focuses on three primary pillars: the expansion of renewable energy capacity, the implementation of nationwide mini-grid projects, and the advancement of the Ghana Nuclear Power Programme. Speaking on the ministry’s priorities, Dr. Jinapor emphasized that the administration is shifting its focus from theoretical planning to achieving measurable, actionable results to bolster the national grid. Central to this strategy is the continued growth of the country's renewable energy infrastructure. The Minister highlighted that Ghana has already reached a renewable energy capacity of 345 megawatts, a milestone that has contributed to an overall national electricity access rate of 89.13%. To reach the 2027 targets, the ministry intends to scale up these figures through targeted investments across the entire energy value chain. Dr. Jinapor stressed the importance of enhancing infrastructure resilience to ensure that the power system can support the country’s industrialization and economic growth goals. In addition to solar and wind initiatives, the government is prioritizing the Ghana Nuclear Power Programme as a key component of its long-term energy security. Dr. Jinapor noted that the implementation of these high-stakes projects would be governed by strict adherence to procurement laws to ensure transparency and accountability. By demanding efficiency and clear outcomes from state agencies, the ministry aims to create a sustainable energy sector that provides reliable power while meeting international green transition standards. This strategy serves as a blueprint for the next three years of infrastructure development under the current administration.

energy and infrastructure|

John Abdulai Jinapor commends NPA CEO for petroleum market stability

The Minister for Energy and Green Transition, John Abdulai Jinapor, has formally commended the Chief Executive Officer of the National Petroleum Authority (NPA), Godwin Edudzi Tameklo, for his role in ensuring stability within Ghana’s petroleum market. Speaking at a performance review retreat for energy sector agencies, the Minister highlighted the NPA’s success in navigating the complexities of the global energy market, which has faced significant volatility. He praised the regulator for its proactive measures in shielding the domestic market from international price fluctuations and supply chain disruptions. During the session, Dr. Jinapor noted that the NPA’s leadership was instrumental in preventing fuel shortages and maintaining a steady supply of petroleum products across the country. He emphasized that this stability is a vital component of the government's broader economic strategy, as it helps to manage the cost of living and provides a predictable environment for businesses. The Minister credited the authority's strategic management for ensuring that the downstream sector remained resilient despite various external pressures. The Minister also extended his appreciation to the leadership of the Bulk Oil Storage and Transportation Company Limited (BOST) for their collaborative efforts. He pointed out that the synergy between the NPA as a regulator and BOST as a strategic storage entity has been vital in managing market uncertainties. By maintaining robust strategic reserves and implementing efficient distribution protocols, these agencies have collectively strengthened Ghana’s energy security framework. The retreat served as a platform to review these institutional successes and identify ways to further enhance operational capacity. Concluding his remarks, Dr. Jinapor urged the leadership of the energy sector agencies to remain vigilant and innovative. He stressed the importance of transparency and efficiency in the administration of the petroleum sector, noting that the government remains committed to supporting these agencies as they work to ensure a reliable and affordable energy supply. The Minister reaffirmed that institutional excellence within the NPA and its partner agencies is essential for achieving the nation's long-term energy sustainability and economic development goals.

A large group of professionals, including traditional leaders, are posing for a group photograph at a Ghana Institution of Surveyors (GhIS) event. The attendees are dressed in formal business suits and traditional Ghanaian cloths like kente and fugu, seated and standing in front of a blue backdrop featuring various corporate sponsor logos.
energy and infrastructure|

Nana Nuamah Kyei-Bafour urges quantity surveyors to protect public funds

Nana Nuamah Kyei-Bafour, Chairperson of the Quantity Surveying Division of the Ghana Institution of Surveyors (GhIS), has urged practitioners to maintain high standards of professional integrity and accountability in public infrastructure projects. Speaking at the division's 2026 Annual General Meeting (AGM) in Tamale, he emphasized that maximizing the impact of public funds is essential for national development. The meeting focused on the critical role quantity surveyors play in ensuring the transparent and efficient use of resources amidst Ghana’s growing infrastructure demands. The conference, themed around "The Value for Money Office Act, 2026," highlighted the strategic necessity of cost management expertise from a project's inception to its final delivery. Surv. Kyei-Bafour noted that with rapid urbanization, the duty to "protect every cedi" has become more pressing. He called for surveyors to be proactive in their oversight, ensuring that every public expenditure yields tangible and sustainable benefits for local communities. Adding to the call for professional excellence, GhIS President Surv. Emmanuel Kofi Cobbold stressed the importance of early intervention in project planning. He argued that involving quantity surveyors at the initial stages of infrastructure development is vital for minimizing financial risks and avoiding cost overruns. This preventative approach is expected to become a cornerstone of public procurement as the institution aligns its practices with new legislative requirements. Looking ahead, the new Value for Money Office is slated to begin its operations in January 2027. This office will formalize the role of quantity surveyors in public-sector accountability, providing a robust framework for monitoring government projects. The GhIS leadership remains confident that these measures will strengthen public trust and ensure that Ghana’s infrastructure investments are both prudent and effective.

A close-up photograph of a man wearing a white safety hard hat and a high-visibility yellow and orange reflective vest speaking into a microphone. He appears to be at an outdoor construction site with a concrete bridge or infrastructure project visible in the blurred background.
energy and infrastructure|

Governs Kwame Agbodza pledges prompt payments for Big Push contractors

The Minister for Roads and Highways, Governs Kwame Agbodza, has given strong assurances to contractors engaged under the 'Big Push' road infrastructure programme that their payments will be processed promptly upon the submission of valid certificates. Speaking during a comprehensive inspection of road projects in the Bono Region, the Minister emphasized that the government has streamlined its financial processes to ensure that infrastructure development continues without the fiscal bottlenecks that previously hindered progress. Mr. Agbodza highlighted that the current administration has significantly improved payment timelines compared to past practices. He noted that, unlike in previous years where payment certificates could linger for several months without action, the current system ensures that funding is readily available to meet obligations once work has been verified. This commitment is intended to build trust with the private sector and ensure that contractors have the necessary liquidity to maintain their work schedules and retain their workforce. During his tour, the Minister inspected the progress of the Sunyani-Atronie-Acherensua road and the Sunyani Outer Ring Road projects. He expressed satisfaction with the quality of work observed on the ground and urged the various contractors to accelerate their pace to meet completion deadlines. Mr. Agbodza reiterated that the 'Big Push' initiative remains a cornerstone of the government’s strategy to bridge the national infrastructure gap and stimulate economic growth through improved connectivity. Addressing specific project challenges, the CEO of Alexiboam Company Limited, one of the firms on-site, explained that their particular project had faced initial delays primarily due to the complex construction of the Tano Bridge. However, the CEO confirmed that the bridge is now nearing completion, which will allow for the rapid finalization of the remaining road stretches. The Minister’s assurance of prompt payment was welcomed by the contractors as a vital support for the successful delivery of these critical transport links.

Akosombo Dam communities urge government to expedite compensation
energy and infrastructure|

Akosombo Dam communities urge government to expedite compensation

Representatives from 52 communities impacted by the construction of the Akosombo Hydroelectric Dam are calling on the government of President John Mahama to expedite the disbursement of outstanding compensation. During a recent stakeholders meeting, community leaders expressed their growing frustration over protracted delays in receiving payments for the loss of their lands and cultural heritage. While the dam has served as a cornerstone of Ghana’s energy sector for decades, the residents of the affected areas argue that the promises made during their resettlement have yet to be fully honored. The compensation process, which saw some initial progress starting in 2008, has since been plagued by administrative lapses and bureaucratic bottlenecks. Community leaders highlighted that while partial payments have been made to some groups, significant sums remain locked due to an embargo on certain compensation streams. They are now urging the government to lift this embargo and implement a more transparent cleanup of the payment system. The goal of this reform is to ensure that financial redress is delivered directly to the rightful landowners, bypassing intermediaries that have historically complicated the process. The Volta River Authority (VRA) has acknowledged these concerns by increasing funding for various resettlement projects aimed at improving local infrastructure. However, community representatives insist that these physical developments are not a substitute for the direct compensation owed for their ancestral assets. They emphasized that a prompt resolution is essential to alleviate the long-standing grievances of thousands of residents who were displaced to facilitate the nation's power generation. As the administration considers these demands, the communities remain focused on securing a final settlement that recognizes their historical contribution to Ghana's development.

Two people are seen crossing a narrow, improvised dirt path over a small body of water in a lush, rural landscape. One person is riding a bicycle across the precarious-looking culvert, which is surrounded by tall green grass and trees under a cloudy sky. This scene highlights the infrastructure challenges faced by residents in the Nadowli-Kaleo district.
energy and infrastructure|

Takpo-Nyuori residents appeal for permanent bridge in Nadowli-Kaleo

Residents of Takpo-Nyuori in the Nadowli-Kaleo District of the Upper West Region are calling on the government to construct a permanent bridge over a critical river crossing that currently isolates the community during the rainy season. The community currently relies on a fragile, makeshift structure that is frequently washed away by rising water levels, creating a persistent danger for travelers and severing vital trade routes. Without a stable crossing, residents are forced to take long, time-consuming detours to reach markets, schools, and healthcare facilities in the district. The lack of infrastructure has significantly impacted local commerce and safety, according to residents. Alijatu Salifu, a trader in the area, highlighted the hazards posed by the current crossing, noting that the unstable bridge puts lives at risk and disrupts the transportation of goods, which is essential for her livelihood. Assembly Member Alexis Anzagra explained that while the community has made several attempts to maintain the crossing, the sheer force of the seasonal rains makes these local repairs unsustainable. He emphasized that the community lacks the financial and technical resources to build a structure capable of withstanding the annual floods. In response to these concerns, the Member of Parliament for Nadowli-Kaleo, Anthony Mwinkaara Sumah, has expressed his commitment to addressing the infrastructure gap. The MP indicated a willingness to provide support for the project but noted that a formal technical assessment must first be conducted to determine the feasibility and engineering requirements of a lasting bridge. For the people of Takpo-Nyuori, the project remains a critical necessity to ensure they are no longer cut off from the rest of the region whenever the rains arrive.