
Ho Municipal Chief Executive (MCE) Stephen Adom has announced that the Ministry of Roads and Highways has authorized the resumption of construction on the Kpenoe–Takla–Hodzo–Tokokoe road. This decision marks a pivotal moment for the infrastructure project, which had previously stalled, leaving local residents to navigate deteriorating conditions. Mr. Adom confirmed that the contractor is currently mobilizing resources and equipment to return to the site, with work expected to commence shortly to address the critical needs of the affected communities.
The move to restart the project follows a formal petition presented by local chiefs, who expressed deep concern over the road's poor state and its negative impact on the region's social and economic well-being. The petition served as a catalyst for renewed government attention, leading to the necessary approvals to get the project back on track. The MCE noted that the restoration of this road is essential for facilitating the movement of people and goods, particularly for farmers in the Kpenoe, Takla, Hodzo, and Tokokoe areas who struggle to transport their produce to markets.
Despite the positive news of the contractor's return, local residents have raised specific concerns regarding the project's scope. Community members have called for the inclusion of street lighting to improve safety and visibility during the night, citing security risks associated with the current unlit sections. In response, Mr. Adom called for maximum cooperation from all stakeholders and community members. He emphasized that a supportive environment is necessary for the contractor to work efficiently and ensure the project is delivered on schedule, ultimately improving the living standards of the municipality's inhabitants.