
Yvonne Nana Afriyie Opare, the Managing Director of Ghana Airports Company Limited (GACL), has announced plans to initiate major infrastructure projects at the Wa, Sunyani, and Bolgatanga airports by the end of 2026. Speaking during GACL’s 20th Anniversary Lecture held in Accra, Opare outlined the company's strategic vision for enhancing domestic air connectivity. The initiative is designed to modernize existing regional facilities and establish new infrastructure to better serve the northern and middle belts of Ghana. The proposed developments include extensive upgrades to the existing airports in Wa and Sunyani, alongside the construction of a brand-new airport in Bolgatanga. A primary objective of these projects is to facilitate jet operations, allowing for larger aircraft to service these routes compared to the smaller turboprop planes currently in use. By expanding the technical capacity and reach of these regional hubs, GACL aims to reduce the heavy reliance on Kotoka International Airport in Accra for domestic flight connections while simultaneously boosting local economic activities. These projects are integrated into GACL’s broader 10-year capital investment program, which is specifically funded through the Airport Infrastructure Development Charge (AIDC). This dedicated levy ensures that aviation infrastructure can be maintained and expanded without placing an undue burden on the national treasury. Opare emphasized that these investments are essential for creating a robust, decentralized aviation network that can support Ghana's long-term growth in travel, trade, and regional logistics.