
The Ho Municipal Assembly has announced a temporary traffic diversion at the Leprosarium Bridge near the Ho Teaching Hospital, effective November 27, 2026. This move is to facilitate essential construction works at the site, which serves as a key transit point within the municipality. Motorists and commuters have been advised to plan their journeys ahead of time to accommodate the changes and avoid unnecessary delays.
To manage the flow of traffic during the construction phase, the Assembly has designated specific alternative routes for road users. Drivers traveling through the affected area are encouraged to utilize the Oxygen City–Barracks–New Town Road or the Titrinu–UHAS–Sokode By-pass. These routes have been identified to minimize congestion and ensure that residents and visitors can still access critical services, including the Ho Teaching Hospital, without significant disruption.
The Municipal Chief Executive, Hon. Stephen Adom, emphasized the necessity of these works for the long-term improvement of the city's infrastructure. He appealed for cooperation and patience from the public, noting that the assembly is committed to ensuring the project is completed efficiently. Adom highlighted that the bridge work is a precursor to further infrastructure developments planned for the municipality.
This construction activity is part of the broader Big Push Project, a government-led initiative aimed at modernizing urban road networks across the country. Beyond the bridge, the assembly has signaled that the Ho Teaching Hospital Road will also undergo reconstruction in the near future. These projects reflect the government's ongoing commitment to enhancing transportation efficiency and safety within the Volta Regional capital.