Anansi News
HomeBriefsWatchAnalysisMapAsk Ghana

Get the daily brief

Ghana's news, read for you and in your inbox every morning. Free, no spam.

Explore

  • Home
  • Briefs
  • Newsletter
  • About

Categories

  • Politics
  • Business
  • Energy & Infrastructure
  • Sports
  • Entertainment
  • Africa

Features

  • Analysis
  • Ghana News Map
  • Ghana Civ Map
  • Cedi Rates
  • Dollar to Cedi
  • Ghana Gold Price
  • BoG Policy Rate

Topics

  • Armed Forces Recruitment
  • WAEC Results & News
  • Nana Ama McBrown
  • NDC News
  • All Topics

Legal

  • Privacy Policy
  • Terms of Service
Anansi News© 2026. All rights reserved.
TodayAfricaBusinessEducationEnergy & InfrastructureEntertainmentHealthNewsPoliticsSportsTechnology
  1. Home
  2. /Energy and Infrastructure

Energy & Infrastructure·1 source·26 November 2026·2 min read

GRIDCo repairs 330kV transmission line damaged by illegal chainsaw operators

GRIDCo repairs 330kV transmission line damaged by illegal chainsaw operators

The Ghana Grid Company Limited (GRIDCo) has deployed technical teams to repair a major 330kV transmission line after illegal chainsaw operators felled a tree onto the infrastructure. The incident, which occurred on November 25, 2026, caused the high-voltage line to trip in the late afternoon, leading to significant electricity disruptions across parts of the Ashanti and Western regions. GRIDCo officials confirmed that the downed tree physically damaged the transmission equipment, necessitating urgent intervention.

The impact of the damage has been most acute in the Ashanti Region, particularly within the Kumasi metropolitan area, where the company was forced to reduce power supply to maintain grid stability. GRIDCo's engineers conducted an immediate investigation to assess the scale of the damage and began the process of clearing the fallen timber and restoring the integrity of the line. The outage highlights the vulnerability of critical national infrastructure to unauthorized activities in protected utility corridors.

In a statement addressing the situation, GRIDCo apologized to affected consumers for the interruption in service and the resulting inconvenience. The company emphasized that its technical teams are working expeditiously to complete the necessary repairs. Full power supply is expected to be restored to the Western and Ashanti regions as soon as the maintenance work is concluded and the line is safely re-energized.

This incident brings renewed attention to the challenges of managing right-of-way zones for high-voltage transmission lines. Encroachment and illegal logging near these lines not only jeopardize the reliability of the national power grid but also present severe safety hazards to those operating in the vicinity. GRIDCo continues to coordinate with security agencies and local communities to monitor these corridors and prevent future damage to the nation's energy infrastructure.

Sources

  • citinewsroom.com: GRIDCo transmission line damage disrupts power supply in parts of Ashanti, Western Regions

    citinewsroom.com · 25 Nov 2026

Know someone who should read this?

Send them this story on WhatsApp.

Share on WhatsApp

Related reporting

A night view of a Ghanaian street scene shrouded in darkness, illuminated primarily by vehicle headlights and a few distant lights. The image captures the impact of a significant power outage, with residential and commercial buildings appearing as dark silhouettes against a cloudy night sky.

GRIDCo restores Aboadze-Anwomaso transmission line after chainsaw damage

Energy & Infrastructure · 4 sources · 26 Nov

Where this happened

  • Kumasi Metropolitan, Ashanti(no town named)

Power and water disruptions

4 more stories reported in Kumasi Metropolitan this week