
The Ghana Petroleum Mooring Systems Company Limited (GPMS) has officially transitioned to a 24-hour cycle for fuel product discharge at its Tema oil jetty. This operational shift follows the successful resolution of various technical hurdles and the implementation of bolstered security measures at the facility. The move, which is actively supported by the National Petroleum Authority (NPA), is designed to streamline downstream operations and enhance the overall efficiency of Ghana's petroleum sector by significantly reducing vessel turnaround times.
Francis Owusu, the Operations and Maintenance Manager at GPMS, explained that the transition was made possible through extensive collaboration with key regulatory and port stakeholders. These included the NPA, the Ghana Ports and Harbours Authority (GPHA), and the Ghana Standards Authority (GSA). Previously, operational limitations and security concerns restricted the specific hours during which vessels could berth and discharge their products. By addressing these core issues, the facility is now equipped to handle cargo around the clock, increasing the daily volume of fuel that can be processed and distributed.
NPA Chief Executive Godwin Kudzo Tameklo emphasized the strategic importance of this upgrade during a recent assessment of the facility. He noted that former restrictions on vessel berthing times had created unnecessary bottlenecks in the national supply chain. The transition to 24-hour operations is expected to mitigate these delays, ensuring a more consistent flow of petroleum products and reducing the financial burden of vessel demurrage costs that often arise from berthing delays.
The announcement of the new operational hours coincided with a visit from several civil society organizations (CSOs), intended to provide greater transparency into the nation’s downstream petroleum infrastructure. Representatives from the CSOs expressed their appreciation for the NPA’s openness and the technical improvements achieved at the GPMS jetty. Moving forward, GPMS and its partners intend to maintain these expanded operations while adhering to strict safety protocols to meet the growing energy demands of the country.