
Ghana Water Limited (GWL) has announced the temporary shutdown of the Owabi Water Treatment Plant in the Ashanti Region following intense rainfall in the area. The decision, taken on November 12, was necessitated after heavy downpours washed significant volumes of sediment and debris into the raw water source. The utility provider explained that the high levels of siltation made immediate treatment impossible without risking damage to the facility's filtration systems or compromising water quality standards.
The suspension of operations has disrupted water supply to several key communities within the Greater Kumasi area. Residents in Asuoyeboah, Tanoso, and Afari are among those currently facing water shortages as GWL teams conduct emergency cleaning and desilting at the plant. The company stated that these emergency measures are essential to ensure that the water distributed to the public remains safe for consumption once production resumes.
Management of Ghana Water Limited has apologized to affected customers for the disruption and urged them to be patient while the cleaning process is underway. Operations at the Owabi facility are expected to resume on November 13, although the company noted that the full restoration of water supply to homes may be gradual. Residents have been advised that it will take time for the distribution system to stabilize and reach optimal pressure levels once the plant is back online.
Power and water disruptions
See this week's map of Ghana →