
Ing. Frank Otchere, the Chief Executive Officer of the Ghana Grid Company (GRIDCo), has conducted a site inspection of the ongoing 161kV Kumasi–Anwomaso transmission line project. This infrastructure upgrade, commonly referred to as the K1K2 project, is a critical component of efforts to reinforce the electricity transmission network in the Ashanti Region. The inspection focused on assessing the progress of stringing works and ensuring that the project remains on track to meet the region's growing power needs.
During the visit, Otchere engaged with the technical teams and project engineers to discuss the timeline and address any operational challenges. He emphasized the urgency of completing the upgrade to provide a more reliable and stable power supply for both residents and commercial industries in the area. The CEO noted that the completion of the K1K2 project is essential for reducing transmission losses and improving the overall efficiency of power delivery across the regional grid.
The scope of the project includes the installation of new transformers and the stringing of high-capacity transmission lines. These improvements are expected to significantly decrease the frequency of power interruptions and provide the necessary infrastructure to support Kumasi's expanding urban footprint. By pushing for a timely completion, GRIDCo aims to fulfill its mandate of providing a robust national interconnected transmission system that can sustain Ghana’s industrial and domestic energy requirements.