
The Electoral Commission Divisional Union of the Public Services Workers Union (PSWU) has called for an immediate halt to plans for the auction of commission vehicles. In a formal petition dated November 9, 2026, the union expressed deep-seated concerns regarding the transparency of the process and the apparent bypass of mandatory regulatory procedures. Union leaders warned that proceeding with the auction under current conditions could undermine the commission’s operational integrity and create unnecessary friction within the organisation.
Central to the union’s grievance is the absence of a properly constituted Board of Survey to oversee the disposal of public assets. According to the PSWU, management has advanced preparations for the auction without establishing this critical oversight body, which is legally required to assess the condition of vehicles and determine their suitability for sale. The union also pointed out that there has been no clear communication regarding the selection of an auctioneer or the criteria being used to identify which vehicles are to be sold.
Beyond procedural issues, the staff union is alarmed by the lack of a comprehensive replacement plan for the aging fleet. They argue that disposing of current vehicles without a strategy to replenish the fleet could severely hamper the Electoral Commission’s ability to conduct its core mandate and ensure operational continuity across the country. The union noted that management had failed to address an earlier petition on the same matter, suggesting a lack of transparency and a refusal to engage in meaningful dialogue with the workers.
The PSWU has demanded full disclosure of the auction details and proper engagement with staff representatives before any further steps are taken. The union further warned of potential staff resistance if management proceeds unilaterally with the disposal. As of the time of reporting, the Electoral Commission management has not issued a public response to the union's demands or clarified whether the scheduled auction will be postponed to allow for a formal review and the inclusion of a Board of Survey.