
The Electricity Company of Ghana (ECG) has scheduled a series of power outages across various parts of Accra and Tema, slated to begin on October 19 and run through October 23, 2026. These planned interruptions are a necessary component of the company’s ongoing efforts to conduct essential maintenance on its distribution network. The utility provider has emphasized that these works are critical for ensuring the continued efficiency and reliability of the power grid serving the nation's primary economic hubs. According to the detailed schedules released by ECG, the interruptions will be staggered, with different communities experiencing power cuts at specific times throughout the five-day period. This approach is designed to manage the maintenance workload across the distribution network while allowing technical teams to safely access and upgrade high-voltage infrastructure. By performing these upgrades now, ECG aims to mitigate the risk of spontaneous equipment failure, which can lead to longer, more unpredictable blackouts for domestic and industrial consumers. This maintenance exercise reflects the utility company's commitment to infrastructure health and grid stability. Residents and business operators in the affected areas are advised to consult the published schedule to make necessary arrangements for their operations. ECG has assured the public that power will be restored to each locality as soon as the specific maintenance tasks for that sector are completed, and they have apologized for any inconvenience these necessary upgrades may cause to the public.
Power and water disruptions
2 more stories reported in Tema Metropolitan this week →