
The Mahama administration has signaled a renewed focus on national infrastructure and utility oversight, marked by significant progress on the Accra-Kumasi Expressway and the commissioning of a modern headquarters for the Public Utilities Regulatory Commission (PURC). Minister for Roads and Highways, Governs Kwame Agbodza, announced that fewer than 20 kilometers of clearing work remains on the expressway, a vital link between Ghana’s two largest cities. Simultaneously, Minister for Energy and Green Transition, Dr. John Abdulai Jinapor, inaugurated the PURC’s new facility in Accra, emphasizing a "new era" of consumer protection and more rigorous oversight of the Electricity Company of Ghana (ECG). These developments underscore a dual strategy of physical connectivity and regulatory reform.
Minister Agbodza highlighted that the Accra-Kumasi project is nearing a connection with the Kumasi Orbiter, praising the Asantehene, Otumfuo Osei Tutu II, for his advocacy and the contractor, Kofi Job Construction Limited, for their steady progress. However, the project faces significant financial hurdles, with costs ballooning from an original estimate of GH¢1.9 billion to nearly GH¢6 billion. In a stern warning, the Minister set an August deadline for contractors on the Accra-Kumasi Bypass to return to their sites or withdraw from the project, asserting that the government has now addressed outstanding compensation issues. This development occurs alongside a professional dispute with the Ghana Institution of Surveyors (GhIS), which has cautioned the government against labeling valuation differences as fraud after Agbodza threatened to involve the Economic and Organised Crime Office (EOCO) over alleged inflation of property claims.
In the energy sector, the new PURC Head Office represents a major shift toward operational efficiency and technical depth. Dr. Shafic Suleman, the Commission’s Executive Secretary, noted that the project was fully self-financed due to improved cash flows from the Cash Waterfall Mechanism—which Minister Jinapor reported has seen monthly fund declarations surge from GH¢6 billion to GH¢15 billion. The Minister reiterated that the Commission must move beyond simple tariff reviews to ensure consumers receive fair value for their payments. The new facility is equipped with advanced laboratories and a real-time monitoring room, designed to enhance the regulator's ability to track utility performance and ensure the financial viability of providers.
On the local government level, efforts to combat seasonal flooding and improve sanitation continue with the sod-cutting for storm drains in Ejura-Sekyedumase by Municipal Chief Executive Rafiu Adam Seidu. This initiative is being paired with the Ejura 24-Hour Economy Market project to stimulate local employment. Similarly, in Ashaiman, MCE Freeman Tsekpo and MP Dr. Ernest Norgbey have reported that drainage construction is 70% complete. Despite these milestones, residents in several municipalities expressed growing frustration over the slow pace of road rehabilitation, urging the government to translate inspections and promises into tangible improvements in their daily travel conditions. Moving forward, the government faces the challenge of balancing these rising infrastructure costs with public expectations for timely delivery.
Public infrastructure
1 more story reported in Ashaiman Municipal this week →